Does it take a while to convert to propane heat?
Converting to propane heat can take a few days to a couple of weeks, depending on the complexity of the installation. Here are the main factors that affect how long it takes:
1. Installation of Propane Tank
- Above-Ground Tank: Installing an above-ground propane tank is typically quicker and may take just a few hours to a day.
- Underground Tank: If you’re installing an underground tank, the process could take 1 to 3 days, as it involves excavation, placing the tank, and ensuring proper safety measures and regulations are followed.
2. Connecting the Propane System
- Connecting to the Furnace or Boiler: The time needed to connect the propane system to your new furnace or boiler usually takes a day, depending on how easy it is to access the connection points.
- Running New Gas Lines: If your home needs new gas lines to be installed or extended, this could add a few days to the project, depending on the complexity.
3. Permitting and Inspections
- Permit Approvals: In some areas, you may need to get permits for the installation, which can delay the process by a few days, depending on how long it takes to receive approval.
- Inspections: After the installation is completed, an inspection may be required, and scheduling this could add additional time.
4. Removal of Oil Equipment (Optional)
- If you’re removing an old oil tank or boiler, the time for removal and disposal could add 1 to 3 days, especially if the oil tank is buried and requires extra work.
5. Weather Conditions
- Weather Delays: If you’re doing an underground installation or outdoor work during inclement weather, delays could occur.
Typical Timeline:
- Simple installations (above-ground tank and easy connections): 1 to 3 days.
- More complex conversions (underground tank, oil tank removal, gas line extensions): 1 to 2 weeks.
In most cases, the actual conversion process is fairly quick, but factors like inspections, permits, and the complexity of your home setup can lengthen the timeline.
First Fuel & Propane office hours are Monday-Friday 8:00am-4:30pm
We are located on Route 9H in Hudson, 5 miles south of Kinderhook and 9 miles north of Claverack, in the 4C Plaza, on the east side of the road.